Home labs & practical projects

Plan capacity and maintenance for a virtual cluster

A project to do with your own tools, with guidance on what to create and capture.

Design project Suggested time: 2–3 hoursNo hardware required for the design
01

What you could create

A virtual infrastructure team must take one host out of service while maintaining critical workloads. Current capacity reports do not include failure headroom.

Example evidence format
Project evidence map (example)
Cluster capacity worksheetScope and inputs
Maintenance readiness and rollback planDecisions and reasoning
Evidence record (example)
EvidenceWhat to capture
Cluster capacity worksheetShow the inputs, scope and decisions behind this record. The plan does not count the maintenance host as available capacity.
Maintenance readiness and rollback planInclude the evidence supporting your conclusion. Storage and network dependencies are considered alongside CPU and memory.
02

What you'll need

Document, spreadsheet or diagram tool

Create three fictional hosts and six VMs with memory, CPU and storage requirements. Mark workload criticality and one placement constraint.

Project record

Keep the working files for cluster capacity worksheet and record assumptions as you go.

Current reference material

Use the linked provider resources to verify the features, access terms and version relevant to your project.

Access & cost

No paid platform is needed for the written version. Use a document, spreadsheet or diagram tool you already have.

The organisation and records are fictional. Write down assumptions; do not substitute confidential employer information.

03

Suggested milestones

  1. 1

    Plan and investigate

    Calculate remaining capacity during maintenance and a concurrent host failure.

  2. 2

    Develop your approach

    Plan workload placement and identify unavailable capacity or licensing assumptions.

  3. 3

    Verify and explain

    Write prechecks, maintenance steps and rollback conditions using current platform guidance.

04

Useful resources

Use these resources to deepen your understanding and check key details.

Turn the project into evidence

Keep your artefacts and reasoning together so you can explain what you did.

A useful starting point

Create three fictional hosts and six VMs with memory, CPU and storage requirements. Mark workload criticality and one placement constraint.

What a good result looks like
  • The plan does not count the maintenance host as available capacity.
  • Storage and network dependencies are considered alongside CPU and memory.

Finish the project

Keep the decision record and note unanswered questions. A written design is not evidence that a technical control has been tested.

Independent home-project guidance, not an official vendor lab or a claim of complete exam coverage. Use your own tools and label the work accurately.