Prepare a control-assurance package for a small system

A project to do with your own tools, with guidance on what to create and capture.

Design project Suggested time: 2–3 hoursNo hardware required for the design
01

What you could create

A fictional system owner needs a structured assurance decision before a new internal service handles sensitive information.

Example evidence format
Project evidence map (example)
System boundary and control evidence matrixScope and inputs
Assurance decision briefing and action planDecisions and reasoning
Evidence record (example)
EvidenceWhat to capture
System boundary and control evidence matrixShow the inputs, scope and decisions behind this record. Inherited controls have identified evidence owners.
Assurance decision briefing and action planInclude the evidence supporting your conclusion. The package distinguishes assessed controls from planned improvements.
02

What you'll need

Document, spreadsheet or diagram tool

Define the system boundary, information types, stakeholders and three selected controls. Use an applicable public framework as a reference, without claiming formal authorisation.

Project record

Keep the working files for system boundary and control evidence matrix and record assumptions as you go.

Current reference material

Use the linked provider resources to verify the features, access terms and version relevant to your project.

Access & cost

No paid platform is needed for the written version. Use a document, spreadsheet or diagram tool you already have.

The organisation and records are fictional. Write down assumptions; do not substitute confidential employer information.

03

Suggested milestones

  1. 1

    Plan and investigate

    Document the boundary and responsibility for inherited versus local controls.

  2. 2

    Develop your approach

    Specify the evidence and assessment method for each selected control.

  3. 3

    Verify and explain

    Record deficiencies, remediation owners and the monitoring needed after the decision.

04

Useful resources

Use these resources to deepen your understanding and check key details.

Turn the project into evidence

Keep your artefacts and reasoning together so you can explain what you did.

A useful starting point

Define the system boundary, information types, stakeholders and three selected controls. Use an applicable public framework as a reference, without claiming formal authorisation.

What a good result looks like
  • Inherited controls have identified evidence owners.
  • The package distinguishes assessed controls from planned improvements.

Finish the project

Keep the decision record and note unanswered questions. A written design is not evidence that a technical control has been tested.